Mynt Systems Energizes Beckmann's

Mynt Systems will be presenting alongside environmental innovators at the upcoming Santa Cruz Work Green Tech event which will be held on April 7, 2021. Stay tuned for details.

Mynt Systems is a building performance firm, with a focus on zero-net-energy retrofit projects that provide services in energy assessments and construction management.

CHALLENGE: Beckmann's previous manufacturing space was 26,000 square feet,. with an additional refrigerated/freezer space located in Watsonville. They wanted to increase production and reduce costs associated with traveling between their production and storage facilities.

SOLUTION: The current location on 17th Avenue is 47,000 square feet, with 6,000 square feet on-site refrigerated/freezer space, all in one location reducing costs and fuel associated with having two locations. A 240' long truck dock able to accommodate 21 delivery trucks. Currently employing around 140 people. Operational almost 24 hours a day. Relocation took place in October, after 90 days of construction, to meet holiday demands and a 30% increase in sales and production. Beckmann's has not relocated their production since the 1989 Earthquake destroyed their facility. Since they were now having to complete a relocation during a global pandemic we worked overtime to ensure their production schedule was not affected. Mynt’s new systems enabled 621,000 annual kWh of energy savings.

Check out the Old World Bakery Gets New High Tech Facility case study!

image.jpeg

Energy efficiency measures include new high efficiency HVAC equipment as well as LED lighting throughout. The 414.18 kW rooftop solar photovoltaic system has already produced 659 MWh which is equivalent to 1 millions pounds of CO2 or 7,700 trees planted. It's projected to offset 90% of their total annual electric usage.

Mynt ensures client satisfaction via a unique six phase system:

  • Phase 1: Consulting

    • Uncover all goals and objectives to make sure they are achieved

    • Effectively communicate improvements for the building, business, and people

    • Ensure opportunities for new profitability

  • Phase 2: Feasibility Study

    • Identify a good project fit, establish budget, and discover potential new value for property

  • Phase 3: Mynt Blueprint

    • Reverse-engineer outcome by focusing on generating new value and improved performance

    • Collect the scope, final design, equipment list, hard construction costs, execution timelines, energy modeling, and economic proforma

  • Phase 4: Terms & Procedures

    • Schedule a meeting with stakeholders in both organizations to discuss the finer points of the construction process

    • Discuss details of agreement, introduce our construction management team, and uncover any potential hurdles to the delivery of the project that will have to be overcome

  • Phase 5: Project Delivery

    • Ensure accuracy of the financial metrics previously presented by utilizing a hands-on approach to project execution

  • Phase 6: Operations & Maintenance

    • Monitor energy usage, inhabitant comfort levels, and systems integration metrics to create the post-project verification report